Expansion of Hong Kong International Airport into a Three-Runway System

Submission of Management Organizations

Feb 2024

 

 

 

 

 

 

Contents

1       Introduction

2       Management Organization of the Main Construction Companies

2.1     Advanced Works Contract

2.2     Deep Cement Mixing (DCM) Works Contracts

2.3     Main Reclamation Works Contract

2.4     Airfield Works Contracts

2.5     Third Runway Concourse and Integrated Airport Centres Works Contract

2.6     Terminal 2 Expansion Works Contracts

2.7     Automated People Mover Works Contracts

2.8     Baggage Handling System Works Contract

2.9     Construction Support (Facilities)

2.10    Airport Support Infrastructure

2.11    Construction Support (Services / Licenses)

2.12    Utilities

3       Management Organization of the Environmental Team

4       Management Organization of the Independent Environmental Checker

Attachment

A.      Organization Chart of the Works Contracts

B.      Organization Chart of the ET and IEC

 

 

Tables

Table 1: Contact Information of Key Personnel

Table 2: Contact Information of ET 

Table 3: Contact Information of IEC 

 

 

 


1        Introduction

The Environmental Impact Assessment (EIA) Report (Register No.: AEIAR-185/2014) prepared for the “Expansion of Hong Kong International Airport into a Three-Runway System” (the Project) has been approved by the Director of Environmental Protection, and an Environmental Permit (EP) (Permit No.: EP-489/2014) has been issued for the project under the Environmental Impact Assessment Ordinance.

The purpose of this updated Management Organizations is to provide the latest information based on the recent contracts awarded under this project. This updated Management Organizations includes the following information:

a)    the management organization of the main construction companies and/or any form of joint ventures associated with the construction of the Project (in Section 2);

b)    the management organization of the Environmental Team (ET) (in Section 3);

c)     the management organization of the Independent Environmental Checker (IEC) and his team (in Section 4); and

d)    organization charts, names of responsible persons and their contact details.

 

 

2        Management Organization of the Main Construction Companies

2.1        Advanced Works Contract

Langfang Huayuan Mechanical and Electrical Engineering Co., Ltd. (Contract P560(R)) is the contractor appointed to undertake the diversion of the existing submarine aviation fuel pipelines.

Construction works of Contract P560(R) have been completed.

2.2        Deep Cement Mixing (DCM) Works Contracts

Penta-Ocean-China State-Dong-Ah Joint Venture (Contract 3201), Samsung-Build King Joint Venture (Contract 3202), Sambo E&C Co., Ltd. (Contract 3203), China Road and Bridge-Sambo Joint Venture (Contract 3204) and Bachy Soletanche-Sambo Joint Venture (Contract 3205) are the contractors appointed to undertake the DCM ground improvement works.

Construction works of Contracts 3201, 3202, 3203, 3204, and 3205 have been completed.

2.3        Main Reclamation Works Contract

Zhen Hua Engineering Company Ltd.-China Communications Construction Company Ltd.-CCCC Dredging (Group) Company Ltd. (ZHEC-CCCC-CDC) Joint Venture (Contract 3206) is the contractor appointed to undertake the main reclamation works.

Names of the responsible persons and their contact details of Contract 3206 are set out in Table 1 below.

2.4        Airfield Works Contracts

Fujita Corporation-China Harbour Engineering Company Ltd.-Zhen Hua Engineering Company Ltd. (FJT-CHEC-ZHEC) Joint Venture (Contract 3301) is the contractor appointed to undertake the construction works for the north runway crossover taxiway.

China Road and Bridge Corporation (Contract 3302) is the contractor appointed to undertake advance works for the eastern vehicular tunnel.

Sinohydro Corporation Limited, Powerchina Airport Construction Company Limited, Paul Y. Construction Company Limited, and Rock-One Engineering Company Limited (SAPR) Joint Venture (Contract 3303) is the contractor appointed to undertake the construction works for the new runway, taxiways, and associated works.

ADB Safegate Hong Kong Limited (Contract 3305) is the contractor appointed to undertake the construction works for the airfield ground lighting system.

Chinney Alliance Engineering Limited (Contract 3306) is the contractor appointed to undertake the works for the observation facility control systems supporting interim Two-Runway System (2RS) and Three-Runway System (3RS).

Paul Y. Construction Company Limited (Contract 3307) is the contractor appointed to undertake the construction works for the fire training facility on the new reclamation area.

DAS Aviation Services Group (Contract 3308) is the contractor appointed to undertake the construction works for the foreign object debris detection system.

China State Construction Engineering (Hong Kong) Ltd. (Contract 3310) is the contractor appointed to undertake the construction work for the North Runway modification works.

Construction works of Contracts 3301 and 3303 have been completed.

Names of the responsible persons and their contact details of Contracts 3302, 3305, 3306, 3307, 3308 and 3310 are set out in Table 1 below.

2.5        Third Runway Concourse and Integrated Airport Centres Works Contract

Wing Hing Construction Co., Ltd. (Contract 3402) is the contractor appointed to undertake enabling works for the new Integrated Airport Centres.

Sun Fook Kong Construction Limited (Contract 3403) is the contractor appointed to undertake building and civil works for the new Integrated Airport Centres.

Shun Hing Systems Integration Co., Ltd. (Contract 3404) is the contractor appointed to undertake the works for the integrated airport control system.

China Road and Bridge Corporation – Bachy Soletanche Group Limited – LT Sambo Co., Ltd Joint Venture (Contract 3405) is the contractor appointed to undertake foundation and substructure works for the Terminal 2 Concourse.

Beijing Urban Construction Group Company Limited and Chevalier (Construction) Company Limited (BUCG-CCCL) Joint Venture (Contract 3408) is the contractor appointed to undertake the construction works for the Terminal 2 Concourse, taxiways, specified sections of eastern vehicular tunnel and associated works.

Names of the responsible persons and their contact details of Contracts 3402, 3403, 3404, 3405 and 3408 are set out in Table 1 below.

2.6        Terminal 2 Expansion Works Contracts

Build King Construction Ltd. (Contract 3501) is the contractor appointed to undertake the construction works for antenna farm and sewage pumping station.

Build King Construction Ltd. (Contract 3502) is the contractor appointed to undertake Terminal 2 (T2) automated people mover (APM) depot modification works.

Leighton–Chun Wo Joint Venture (Contract 3503) is the contractor appointed to undertake T2 foundation and substructure works.

Gammon Engineering & Construction Company Limited (Contract 3508) is the contractor appointed to undertake T2 expansion works.

Construction works of Contracts 3501, 3502 and 3503 have been completed.

Names of the responsible persons and their contact details of Contract 3508 are set out in Table 1 below.

2.7        Automated People Mover Works Contracts

CRRC Puzhen Bombardier Transportation Systems Ltd. and CRRC Nanjing Puzhen Co., Ltd. (PBTS – CRRC PZ) consortium (Contract 3601) is the contractor appointed to undertake works for the new Automated People Mover (APM) system (TRC Line).

Niigata Transys Company Ltd. (Contract 3602) is the contractor appointed to undertake the existing APM system modification works.

Names of the responsible persons and their contact details of Contracts 3601 and 3602 are set out in Table 1 below.

2.8        Baggage Handling System Works Contract

Vanderlande Industries Hong Kong Limited and Shun Hing Systems Integration Company Limited (Contract 3603) is the contractor appointed to undertake the construction works of baggage handling system (BHS).

Names of the responsible persons and their contact details of Contract 3603 are set out in Table 1 below.

2.9        Construction Support (Facilities)

China State Construction Engineering (Hong Kong) Ltd. (Contract 3721) is the contractor appointed to undertake the construction of the infrastructure works and building facilities on the new reclamation area.

Tapbo Construction Company Limited and Konwo Modular House Limited Joint Venture (Contract 3722) is the contractor appointed to undertake the design and construction of support facilities in western support area.

Tapbo Construction Company Limited and Konwo Modular House Limited Joint Venture (Contract 3723) is the contractor appointed to undertake the design and construction of support facilities in eastern support area.

Shun Yuen Construction Company Limited (Contract 3728) is the contractor appointed to undertake the minor site works within the airside and landside areas of the existing airport island.

Wing Hing Construction Co., Ltd. (Contract 3733) is the contractor appointed to undertake the emergency repair service.

Construction works of Contract 3722 and 3723 have been completed. Names of the responsible persons and their contact details of Contracts 3721, 3728 and 3733 are set out in Table 1 below.

2.10     Airport Support Infrastructure

China State Construction Engineering (Hong Kong) Ltd. (Contract 3801) is the contractor appointed to undertake the construction works of APM and BHS tunnels on existing airport island.

Gammon Engineering & Construction Company Limited (Contract 3802) is the contractor appointed to undertake the construction works of APM and BHS tunnels and related works mainly on reclaimed land area.

Beijing Urban Construction Group Company Limited - Beijing Urban Construction International Company Limited - Kin Shing (Leung's) General Contractors Ltd Joint Venture (Contract 3804) is the contractor appointed to undertake the construction works of East Fire Station (EFS) and Landside Fire Station (LFS) on reclaimed land area.

Chinney Construction Co., Ltd. (Contract 3805) is the contractor appointed to undertake the construction of New Airport District Police Operational Base (NPOB) and related works mainly on reclaimed land area.

Names of the responsible persons and their contact details of Contracts 3801, 3802, 3804 and 3805 are set out in Table 1 below.

2.11     Construction Support (Services / Licenses)

K. Wah Concrete Company Limited (Contract 3901A) and Gammon Construction Limited (Contract 3901B) are the licensees appointed to establish, operate, and maintain concrete batching facilities at the Project site.

Gitanes – Crown Asia Joint Venture (Contract 3908) is the contractor appointed to provide services of site management and logistic control of 3RS quays, as well as flat top barge and vehicle delivery services between the launching point in Hong Kong and 3RS quays.

Sinohydro Corporation Limited, Powerchina Airport Construction Company Limited, and Rock-One Engineering Company Limited Joint Venture (Contract 3913) is the contractor appointed to undertake existing asphalt batching facilities and provide, operate as well as maintain associated facilities, plants and equipment at the Project site.

Names of the responsible persons and their contact details of Contract 3901A, 3901B, 3908 and 3913 are set out in Table 1 below.

2.12     Utilities

CLP Power Hong Kong Limited appointed Kum Shing (K.F.) Construction Company Limited (132 kV Cable) to provide service of laying of 132 kV Cable at the Project site.

Names of the responsible persons and their contact details of 132 kV Cable are set out in Table 1 below.

Table 1: Contact Information of Key Personnel

Party

Position

Name

Telephone

Email

Contractor 3206

Main Reclamation Works

(ZHEC-CCCC-CDC Joint Venture)

Project Manager

Alan Mong

3763 1352

alan.mong@3206.zccjv3rs.com

Environmental Officer

Zhang Bin Wang

3763 1525

zb.wang@3206.zccjv3rs.com

Contract 3302

Eastern Vehicular Tunnel Advance Works

(China Road and Bridge Corporation)

Project Manager

Dickey Yau

5699 4503

dickey.yau@crbc.com.hk

Environmental Officer

Dennis Ho

5645 0563

dennis.ho@crbc.com.hk

Contract 3305 Airfield Ground Lighting System

(ADB Safegate Hong Kong Limited)

Project Manager

Allam Al-Turk

2944 9725

allam.al-turk@adbsafegate.com

Environmental Officer

Ivan Ting

9222 9490

pochung.ting.ext@adbsafegate.com

Contract 3306

Observation Facility Control System Supporting Interim 2RS and 3RS

(Chinney Alliance Engineering Limited)

Project Director

Dennis Yam

9551 9920

dennis.yam@chinney-eng.com

Environmental Officer

Richard Liu

9216 8990

richardliu@chinney.com.hk

Contract 3307

Fire Training Facility

(Paul Y. Construction Company Limited)

Project Manager

Ken Tang

9640 5397

kenkmtang@pyengineering.com

Environmental Officer

Ferddy Leung

5585 6746

ferddyleung@pyengineering.com

Contract 3308

Foreign Object Debris Detection System

(DAS Aviation Services Group)

Project Manager

Jeffrey Yau

9873 7422

jeffreyyau@dchmsc.com.hk

Contract 3310

North Runway Modification Works

(China State Construction Engineering (Hong Kong) Ltd.)

Project Manager

Kingsley Chiang

9424 8437

kingsleychiang@cohl.com

Environmental Officer

Federick Wong

9842 2703

cheukwai_wong@cohl.com

Contract 3402 New Integrated Airport Centres Enabling Works

(Wing Hing Construction Co., Ltd.)

Project Manager

Wyman Lau

6112 9753

wymanlau@whconst.com.hk

Health Safety Environmental Manager

Mike Leung

6625 2550

mikeleung@whconst.com.hk

Contract 3403

New Integrated Airport Centres Building and Civil Works

(Sun Fook Kong Construction Ltd.)

Project Manager

Alice Leung

9220 3162

aliceleung@sfk.com.hk

Environmental Officer

Ray Cheung

9785 1566

sfk.raycheung@gmail.com

Contract 3404

Integrated Airport Control System

(Shun Hing Systems Integration Co., Ltd.)

Project Manager

Andy Ng

9102 2739

andy.ng@shunhinggroup.com

Safety and Environmental Manager

Josephine Chang

9383 7705

josephine.chang@shunhinggroup.com

Contract 3405

Third Runway Concourse Foundation and Substructure Works

(China Road and Bridge Corporation – Bachy Soletanche Group Limited – LT Sambo Co., Ltd. Joint Venture.)

Project Manager

Francis Choi

9423 3469

francis.choi@crbc.com.hk

Environmental Officer

Jacky Lai

9028 8975

jacky.lai@crbc.com.hk

Contract 3408

Third Runway Concourse and Apron Works

(Beijing Urban Construction Group Company Limited and Chevalier (Construction) Company Limited Joint Venture)

Senior HSE Manager

Qian Zhang

5377 7976

zhangqian@bucg.cc

Environmental Officer

Malcolm Leung

7073 7559

malcolm.leung@bucg.cc

Contract 3508

Terminal 2 Expansion Works

(Gammon Engineering & Construction Company Limited)

Project Director

Richard Ellis

6201 5637

richard.ellis@gammonconstruction.com

Environmental Officer

Endy Tse

6228 7768

Endy.Tse@gammonconstruction.com

Contract 3601

New APM System (TRC Line)

(CRRC Puzhen Bombardier Transportation Systems Limited and CRRC Nanjing Puzhen Co., Ltd. Joint Venture)

Project Manager

Hongdan Wei

158 6180 9450

wei.hongdan@pbts-crrc.com

Environmental Officer

H Y Yue

9185 8186

hy.yue@egjv.com.hk

Contract 3602

Existing APM System Modification Works

(Niigata Transys Co., Ltd.)

Project Manager

Xia Bo

6586 4950

xia3855@ihi-g.com

Environmental Officer

Y M Tong

5316 9801

ymtong@ihi.com.hk

Contract 3603

Baggage Handling System

(Vanderlande Industries Hong Kong Ltd. and Shun Hing Systems Integration Co., Ltd.)

Project Manager

K C Ho

9272 9626

ho.kee.cheung@shunhinggroup.com

Environmental Officer

Richard Ng

9802 9577

richard.ng@shunhinggroup.com

Contract 3721

Construction Support Infrastructure Works

(China State Construction Engineering (Hong Kong) Ltd.)

Senior Project Manager

Thomas Lui

9011 5340

thomas_lui@cohl.com

Environmental Officer

John Mak

6273 8703

chihung_mak@cohl.com

Contract 3728

Minor Site Works

(Shun Yuen Construction Company Limited)

Contract Manager

C K Liu

9194 8739

ckliu@shunyuen.com

Environmental Officer

Dan Leung

6856 5899

dan.leung@shunyuen.com

Contract 3733

Emergency Repair Service

(Wing Hing Construction Co., Ltd.)

Project Manager

Michael Kan

9206 0550

michaelkan@whconst.com.hk

SHE Manager

Mike Leung

6625 2550

mikeleung@whconst.com.hk

Contract 3801

APM and BHS Tunnels on Existing Airport Island

(China State Construction Engineering (Hong Kong) Ltd.)

Project Manager

Kingsley Chiang

9424 8437

kingsleychiang@cohl.com

Environmental Officer

Eunice Kwok

9243 1331

laihung_kwok@cohl.com

Contract 3802

APM and BHS Tunnels and Related Works

(Gammon Engineering & Construction Company Limited)

Project Director

John Adams

6111 6989

john.adams@gammonconstruction.com

Environmental Officer

Yan Ng

5345 8555

yan.ng@gammonconstruction.com

Contract 3804 East and Landside Fire Stations

(Beijing Urban Construction Group Company Limited -Beijing Urban Construction International Company Limited – Kin Shing (Leung's) General Contractors Ltd Joint Venture)

Project Manager

Mr. Zhang Xianda

4661 6818

zhangxianda@bucg.cc

Environmental Officer

Ms. Kimberly Wong

5542 1669

kimberly.wong@bucg.cc

Contract 3805 New Airport District Police Operational Base

(Chinney Construction Co., Ltd)

Project Manager

Cheuk Wing Wai

9339 8321

wwcheuk@chinney.com.hk

Environmental Officer

Mike Li

6306 8547

mikeli@chinney.com.hk

Contract 3901A Concrete Batching Facility

(K. Wah Concrete Company Limited)

Project Manager

Benedict Wong

9553 2806

benedictwong@kwcml.com

Environmental Officer

C P Fung

9874 2872

cpfung@kwcml.com

Contract 3901B

Concrete Batching Facility

(Gammon Construction Ltd.)

General Manager

Gabriel Chan

2435 3260

gabriel.chan@gammonconstruction.com

Environmental Officer

Rex Wong

2695 6319

rex.wong@gammonconstruction.com

Contract 3908 Quay Management Services

(Gitanes – Crown Asia Joint Venture)

Project Manager

Mr. Ian Li

9750 6438

ian.li@udl.com.hk

Environmental Officer

Mr. Tang Kai Fun

9406 3526

gitanes.eo@udl.com.hk

Contract 3913

Asphalt Batching Plant

(Sinohydro Corporation Limtied, Powerchina Airport Construction Company Limited, and Rock-One Engineering Company Limited Joint Venture)

Project Manager

Xie Yi Sheng

6580 6005

16jxieys@powerchina.cn

Environmental Officer

Kenneth Chan

9300 2182

kennethchan3913@gmail.com

132kV Cable

(CLP Power Hong Kong Limited / Kum Shing (K.F.) Construction Company Limited)

Engineer

Ken Fung

6391 9087

ken.fung@clp.com.hk

Project Engineer

Ivan Shek

9822 5836

ivan.shek@kumshing.com.hk

Attachment A presents the organization charts of all the above-mentioned contractors required under EP Condition 2.4.

 

3        Management Organization of the Environmental Team

The management organization of the Environmental Team (ET), including names of the ET Leader and Deputy ET Leaders and their contact details are set out in Table 2 below:

Table 2: Contact Information of ET

Name

Position

Telephone

Email

Terence Kong

ET Leader

2828 5919

Terence.Kong@mottmac.com

Heidi Yu

Deputy ET Leader

2828 5704

Heidi.Yu@mottmac.com

Ken Wong

Deputy ET Leader

2828 5817

Ken.Wong@mottmac.com

 

Attachment B presents an organization chart of the ET (together with that for the IEC, as described in Section 4 below) required under EP Condition 2.4.

 

4        Management Organization of the Independent Environmental Checker

The management organization of the Independent Environmental Checker (IEC), including names of the IEC and Deputy IEC are set out in Table 3 below:

Table 3: Contact Information of IEC

Name

Position

Telephone

Email

Roy Man

IEC

3729 0380

roy.man@aecom.com

Jackel Law

Deputy IEC

3856 5312

jackel.law@aecom.com

 

Attachment B presents an organization chart of the IEC required under EP Condition 2.4.

 

 

A. Organization Chart of the Works Contracts



                                                                                              

 

 

  

 



 

Organization Chart of China State Construction Engineering (Hong Kong) Ltd. (Contract 3310) for North Runway Modification Works

Project Director
Victor Wu
,Project Manager
Kingsley Chiang 
,Contractor Representative
S L Tam 
,Project Environmental Officer
Federick Wong 
,Construction Team Leader
Maxwell Chow
,Environmental Supervisors,Section Agents


 




 

 


 




 


 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Organization Chart of Chinney Construction Co., Ltd (Contract 3805) for New Airport District Police Operational Base

 

 




Organization Chart of CLP Power Hong Kong Limited / Kum Shing (K.F.) Construction Company Limited (132kV Cable)

CLP Contracts Responsible Officer

,CLP Senior Engineer,CLP Engineer
Ken Fung
,Kum Shing Senior Project Manager,Kum Shing SHEQ Manager,Kum Shing Project Engineer
Ivan Shek


 



 

B. Organization Chart of the ET and IEC